The first two interior paintings in the hedgehog feeding station.
-
It's all coming together at last!
@babe it looks fantastic!
-
It's all coming together at last!
Baffles now cut out, sanded, and the first layers of paint going on. The sign on the front is painted.
Should be ready to put the main part of the building together tomorrow! -
Baffles now cut out, sanded, and the first layers of paint going on. The sign on the front is painted.
Should be ready to put the main part of the building together tomorrow!@babe that job sounds baffling
-
Baffles now cut out, sanded, and the first layers of paint going on. The sign on the front is painted.
Should be ready to put the main part of the building together tomorrow!In the event anyone is thoroughly invested in all of this and has a spare fiver they'd like to put towards the renovations, I have a tip jar on my website
http://wagtails.art(It's safe for work, don't worry! )
-
In the event anyone is thoroughly invested in all of this and has a spare fiver they'd like to put towards the renovations, I have a tip jar on my website
http://wagtails.art(It's safe for work, don't worry! )
I'll be making and selling some tiny paintings like in the hog house at some point too I think (3-4cm in size), once it's all done
-
I'll be making and selling some tiny paintings like in the hog house at some point too I think (3-4cm in size), once it's all done
The baffles are almost painted. Tomorrow i put the art on the walls then it's time to assemble and pour the floor!
-
The baffles are almost painted. Tomorrow i put the art on the walls then it's time to assemble and pour the floor!
Marine hinges and hasps for the roof flaps, I've seen the state store bought hedgehog boxes get into and we're bypassing that thank you very much!
If this damn thing is going to last 15 years it won't be let down by a bloody hinge.
Silicone and fibreglass sheet to cover the flaps too, and hdpe blocks to keep it well off the ground -
Marine hinges and hasps for the roof flaps, I've seen the state store bought hedgehog boxes get into and we're bypassing that thank you very much!
If this damn thing is going to last 15 years it won't be let down by a bloody hinge.
Silicone and fibreglass sheet to cover the flaps too, and hdpe blocks to keep it well off the groundEventually I plan to rebuild the Hog's Hedge (the other feeding station) from scratch. What I've turned this into is a fairly close approximation of how I'd go about it (just with a higher ceiling in the main chamber. For class, like. Love a high ceiling)
-
Eventually I plan to rebuild the Hog's Hedge (the other feeding station) from scratch. What I've turned this into is a fairly close approximation of how I'd go about it (just with a higher ceiling in the main chamber. For class, like. Love a high ceiling)
@babe well yeah, where else are you going to put the chandelier?!
-
@babe well yeah, where else are you going to put the chandelier?!
@babe (I'm being silly, that's a terrible idea)
-
@babe (I'm being silly, that's a terrible idea)
@sambeaven (i think we both know I'd do it)
-
Eventually I plan to rebuild the Hog's Hedge (the other feeding station) from scratch. What I've turned this into is a fairly close approximation of how I'd go about it (just with a higher ceiling in the main chamber. For class, like. Love a high ceiling)
It sounds like in about 200 years they're going to make it a listed property.
-
Eventually I plan to rebuild the Hog's Hedge (the other feeding station) from scratch. What I've turned this into is a fairly close approximation of how I'd go about it (just with a higher ceiling in the main chamber. For class, like. Love a high ceiling)
Honestly at this point I'm looking forward to getting my studio back. It's had a giant dust sheet and cardboard laid out on it got 2 weeks covered in wood at various stages of painting.
I like to start a project, do the project to completion, and then rest. A project like redecorating these would ordinarily be 2 days. I do not have the patience for all this waiting for things to dry stuff (and with 6+ layers to put on its a lot of waiting)
-
Marine hinges and hasps for the roof flaps, I've seen the state store bought hedgehog boxes get into and we're bypassing that thank you very much!
If this damn thing is going to last 15 years it won't be let down by a bloody hinge.
Silicone and fibreglass sheet to cover the flaps too, and hdpe blocks to keep it well off the ground@babe the world needs more of this commitment to durable hingedness
-
It sounds like in about 200 years they're going to make it a listed property.
@cazabon the way it's looking, it's possible it'll still be around!
-
Honestly at this point I'm looking forward to getting my studio back. It's had a giant dust sheet and cardboard laid out on it got 2 weeks covered in wood at various stages of painting.
I like to start a project, do the project to completion, and then rest. A project like redecorating these would ordinarily be 2 days. I do not have the patience for all this waiting for things to dry stuff (and with 6+ layers to put on its a lot of waiting)
The floor decorations starting to go on now
-
The floor decorations starting to go on now
feels Japanese in the intricate details. i can draw stick people💪
-
The floor decorations starting to go on now
@babe The floor is flowers !
-
The floor decorations starting to go on now
I got the epoxy layer on the floor of the nesting box this morning so that's as good as finished now.
The last of the tiny paintings get done in the baffles tomorrow, I just need the coats on them atm to thoroughly dry.
I need a few more dry flowers for the floor then I can assemble it all and get it poured. Nearly there! Couple of days left at most -
feels Japanese in the intricate details. i can draw stick people💪
@m3t00 The floor flowers are real pressed flowers rather than painted, I can't take credit 😅