The first two interior paintings in the hedgehog feeding station.
-
@babe well yeah, where else are you going to put the chandelier?!
@babe (I'm being silly, that's a terrible idea)
-
@babe (I'm being silly, that's a terrible idea)
@sambeaven (i think we both know I'd do it)
-
Eventually I plan to rebuild the Hog's Hedge (the other feeding station) from scratch. What I've turned this into is a fairly close approximation of how I'd go about it (just with a higher ceiling in the main chamber. For class, like. Love a high ceiling)
It sounds like in about 200 years they're going to make it a listed property.
-
Eventually I plan to rebuild the Hog's Hedge (the other feeding station) from scratch. What I've turned this into is a fairly close approximation of how I'd go about it (just with a higher ceiling in the main chamber. For class, like. Love a high ceiling)
Honestly at this point I'm looking forward to getting my studio back. It's had a giant dust sheet and cardboard laid out on it got 2 weeks covered in wood at various stages of painting.
I like to start a project, do the project to completion, and then rest. A project like redecorating these would ordinarily be 2 days. I do not have the patience for all this waiting for things to dry stuff (and with 6+ layers to put on its a lot of waiting)
-
Marine hinges and hasps for the roof flaps, I've seen the state store bought hedgehog boxes get into and we're bypassing that thank you very much!
If this damn thing is going to last 15 years it won't be let down by a bloody hinge.
Silicone and fibreglass sheet to cover the flaps too, and hdpe blocks to keep it well off the ground@babe the world needs more of this commitment to durable hingedness
-
It sounds like in about 200 years they're going to make it a listed property.
@cazabon the way it's looking, it's possible it'll still be around!
-
Honestly at this point I'm looking forward to getting my studio back. It's had a giant dust sheet and cardboard laid out on it got 2 weeks covered in wood at various stages of painting.
I like to start a project, do the project to completion, and then rest. A project like redecorating these would ordinarily be 2 days. I do not have the patience for all this waiting for things to dry stuff (and with 6+ layers to put on its a lot of waiting)
The floor decorations starting to go on now
-
The floor decorations starting to go on now
feels Japanese in the intricate details. i can draw stick people💪
-
The floor decorations starting to go on now
@babe The floor is flowers !
-
The floor decorations starting to go on now
I got the epoxy layer on the floor of the nesting box this morning so that's as good as finished now.
The last of the tiny paintings get done in the baffles tomorrow, I just need the coats on them atm to thoroughly dry.
I need a few more dry flowers for the floor then I can assemble it all and get it poured. Nearly there! Couple of days left at most -
feels Japanese in the intricate details. i can draw stick people💪
@m3t00 The floor flowers are real pressed flowers rather than painted, I can't take credit 😅
-
I got the epoxy layer on the floor of the nesting box this morning so that's as good as finished now.
The last of the tiny paintings get done in the baffles tomorrow, I just need the coats on them atm to thoroughly dry.
I need a few more dry flowers for the floor then I can assemble it all and get it poured. Nearly there! Couple of days left at most@babe after all this, i hope the hedgepigs apretiate fine art *smile*
-
I got the epoxy layer on the floor of the nesting box this morning so that's as good as finished now.
The last of the tiny paintings get done in the baffles tomorrow, I just need the coats on them atm to thoroughly dry.
I need a few more dry flowers for the floor then I can assemble it all and get it poured. Nearly there! Couple of days left at mostThe last few paintings done, each about 3cm
A portrait of Egg, a vase of flowers, a horse because paintings of horses are always fancy and high class, and the hedgehogs' very own original kandinsky
-
The last few paintings done, each about 3cm
A portrait of Egg, a vase of flowers, a horse because paintings of horses are always fancy and high class, and the hedgehogs' very own original kandinsky
@babe These hedgehogs (and mice and slugs?) are gonna be so cultured
-
@babe These hedgehogs (and mice and slugs?) are gonna be so cultured
@FrazzledBrynn They're going to be the fanciest hogs in town
-
The last few paintings done, each about 3cm
A portrait of Egg, a vase of flowers, a horse because paintings of horses are always fancy and high class, and the hedgehogs' very own original kandinsky
This is such a delightful idea, and I've been truly enjoying following along with your current project.
-
The last few paintings done, each about 3cm
A portrait of Egg, a vase of flowers, a horse because paintings of horses are always fancy and high class, and the hedgehogs' very own original kandinsky
The baffles are finished!
-
The baffles are finished!
-
The last few paintings done, each about 3cm
A portrait of Egg, a vase of flowers, a horse because paintings of horses are always fancy and high class, and the hedgehogs' very own original kandinsky
@babe Will there be a grand opening? Could Egg nibble the cordon?
-
The baffles are finished!
@babe Pretty!
